STICKIT PRO – 2KG POT

QUICK START INSTRUCTION GUIDE

Please take the time to read through all of these steps prior to starting and mixing any of the adhesive. It is recommended to prepare for injection by drilling the holes as in Step 16 below before mixing the adhesive and preparing the pump.

Step 1

Unscrew And Remove Pot Lid Handle

Twist the top of the pot anti-clockwise to unscrew and lift to remove.

Step 2

Fold Pouch Along Centre Line

Fold pouch inwards along red centre line so spouts lay back to back.

Step 3

Cut Both Spouts At Trim Marks To Open

Hold spout at base and squeeze to prevent any product leakage from pouch. Using scissors, cut tips off pouch to open

Step 4

Pour Product Into Mixing Bottle

Pour contents of both side from one pouch into mixing bottle.

Note: It is recommended to only prepare one pouch in the mixing bottle at a time.

Important Note

Multiple pouches should be mixed one after the other in mixing bottle only, then the mixed adhesive can be added to the pump bottle.

Do not attempt to mix and shake in the 5 litre pump bottle – always use the small mixing bottle provided.

Adding multiple pouches of mixed adhesive to the pump bottle will decrease pot life – we suggest adding no more than 4 pouches at any one time. Rinse the mixing bottle well with water straight after use.

Once the epoxy adhesive has been mixed together it has been activated and will begin to set.

Mixing too much product at one time will increase the risk of the adhesive going off before you complete your job.

When performing repairs on a large area, rinse pump bottle between mixes if using product for longer than 2 hours.

Pro Tip

Flush pump with water prior to use, and before adding adhesive to bottle, as this will make cleanup easier.

Fill your pump bottle with water, fit the pump handle then pressurise and push trigger until water flows out of needle.

Shake pump bottle so water coats inside of bottle then remove handle and pour out remaining water.

Fill with adhesive, pressurise and hold needle over waste container, then push trigger until white adhesive starts to flow out of needle and release trigger.

You are now ready to start injecting.

Step 5

Shake To Mix Product

Shake mixing bottle up and down rapidly for at least 10 seconds to fully mix the epoxy adhesive.

Step 6

Let Product Settle Before Use

Let the mixing bottle stand for at least 60 seconds before use. This is to allow any bubbles that formed during the mixing process to rise to the top and not be drawn out through the application tube.

Step 7

Transfer Contents To Application Pot

Empty contents of mixing bottle into pump application pot.

You can now mix more product in the mixing bottle if required.

Step 8

Rinse Mixing Bottle

Rinse empty mixing bottle well with water.

Step 9

Replace Pot Lid And Close

Twist pot lid clockwise and screw until firm to ensure the application pot is fully sealed.

Connect To Air Supply

The pressure pot is designed to inject at a max of 20psi with a flow rate of approx 3ltr/min. The pot uses a
standard Nitto style fitting for connection to the compressor hose. If your compressor doesn’t have a Nitto style female fitting on the end of the hose, you will need to fit a female Nitto adaptor to your compressor hose to suit the male Nitto fitting on the pressure pot.

Alternatively, you can use the Shcrader valve adapter if you have a tyre pump/compressor.

The pressure pot is supplied ready to use, however a test should be performed with water prior to each use in order to make cleanup easier. This is should also be done to check for leaks and confirm pressure is set to 20psi as a starting pressure prior to each use.

Important Note

The pressure pot is supplied ready to use, however a test should be performed with water prior to each use in order to make cleanup easier. This is should also be done to check for leaks and confirm pressure is set to 20psi as a starting pressure prior to each use.

Warning: Not flushing lines and testing with water prior to use results in a more difficult cleanup and risks the waste of adhesive if there are leaks in any of the fittings.

To perform this test, unscrew the aluminium pot base from the lid/handle in anticlockwise direction. Half fill with water then replace the lid and twist firmly to secure. Attach the air hose from your compressor to the fitting above the pressure gauge. Ensure the red valve is in the off position (90 degrees to fitting). Remove the cap from the needle and depress the trigger to test injection flow.

Step 10

Prepare To Pressurise Pot

The 2kg application pot needs to be connected to a small compressor or air pump to pressurise it for use. Included in the pot kit is a Nitto connector and a Schrader valve connector. This allows you to use either a standard air compressor connection, or a tyre air pump/compressor to charge the pot for use.

Step 11

Examples Of Small Compressors

Air compressors or tyre pumps similar to these can be used to pressurise the pot for use.

Step 12

Adjust Pressure Regulator

Once you have connected your air supply, turn the black pressure adjusting knob clockwise to increase pressure or anticlockwise to decrease pressure as required.

Step 13

Correct Pressure For Usage

It is recommended that the pot air pressure is set to 20 psi for correct usage. The pressure should be adjusted if the pressure gauge is not showing the pressure is approximately at 20 psi.

Ready For Application

The product is now ready for application.

Note: We recommend you prepare the application needle as in step 10 and 11 before mixing the epoxy adhesive.

You may also wish to drill and prepare the application holes before mixing the product. Or you can do this while you let the product stand as in step 7.

Step 14

Fit Needle to Luer

Remove clear cap from base of needle and twist needle clockwise to fit into the application hose.

Step 15

Prepare Needle and Plug

Insert needle into rubber plug and push through.

Step 16

Drill Holes

Carefully drill holes at 100mm intervals around edges of tiles.

Pro Tip: Retain mortar/grout dust after removing drill as you will can use this to plug the hole afterwards to help ensure the grout matches the original colour.

Step 17

Inject StickIt Pro

Insert needle into drill hole and slide rubber plug down needle to seal hole.

Step 18

Press Trigger to Inject

Press and hold trigger for 3 – 5 seconds per hole, or until adhesive begins to come out of the drill hole.

Step 19

Clean Up

Using a damp cloth, wipe over the application area to clean up excess adhesive before it dries.

Usage Notes and Warnings – Please Read Carefully

Mixing

Stickit Pro is activated by mixing parts A & B – vigorous and rapid shaking is required to ensure adequate mixing.

Stickit Pro must be used before end of pot life (up to 2 hours max). The adhesive will increase in viscosity as end of pot life approaches. Discard any unused adhesive and wash injection equipment immediately if the adhesive thickens or viscosity increases during use or within 2 hours of first mix.

Mix only one pouch of adhesive at a time – the mixing bottle (for 5kg size)/ or pump bottle (for 1kg size) must not be more than 50% full to achieve adequate mixing action by shaking.

Entire contents of pouch must be mixed – do not attempt to mix a smaller quantity or store an open pouch.

If more than 1 pouch of adhesive is required

Multiple pouches should be mixed one after the other in mixing bottle only, then the mixed adhesive can be added to the pump bottle.

Do not attempt to mix and shake in the 5ltr pump bottle – always use the small mixing bottle provided. Adding multiple pouches of mixed adhesive to the pump bottle will decrease pot life – we suggest adding no more than 4 pouches at any one time. Rinse the mixing bottle well with water straight after use.

Stickit Pro can be used to fill larger voids and cavities. It may be necessary to top up injection holes where larger cavities exist. Where adhesive level drops, top up with more adhesive within 20 minutes of first injection.

When repairing porous natural stones like limestone and terrazzo test on a small area first to ensure no colour change/staining/bleeding occurs.

Stickit Pro can be used on damp substrates but should not be used where water may be pooling. Using drawing up needles on a syringe and injecting compressed air may assist in removing pooling water before injecting into damp areas.

Do not inject Stickit Pro where the surface temperature may be below 5 degrees C / 40 degrees F as cure will stop. Heat the substrate if possible before injecting.

Pot life can be reduced by mixing adhesive and leaving exposed to air for 10-15 minutes before injecting.

Precaution: In internal wet areas and balconies drill the first hole slowly and regularly remove drill to gauge depth of tile, do not drill deeper as this may penetrate any waterproof membrane and the flooring substrate. When the desired drilling depth is reached mark the depth on the drill bit with some masking tape to ensure all future holes are drilled to the same depth. As a guide the flutes (grooves) in the drill bit are 20mm long.

Application Surface Clean Up

Wipe up excess Stickit Pro before dry with a wet rag. Sprinkle mortar dust onto injection holes and rub with finger to disguise hole. Drill holes may be noticeable immediately after repair but will blend in with original grout after a short period of time. Scuffing the entire grout line gently to remove stained surface layer will help disguise the injection points if these are visible upon drying.

Application Bottle Clean Up

Holding handle, twist bottle anticlockwise to release air pressure. Discard any left over product from bottle and rinse out well with water. Add a small amount of water to the bottle, tightent pump handle and pressurise, then shake bottle and press trigger to flush water through. Then discard water and repeat this step 2 – 3 times with clean water.

Pro Tip: Use hot water for best results to flush mixing and pump bottles.

Storage

Store needle in storage cover.

Note: Before next use, pump a small amount of water out of luer fitting before attaching needle to make sure there are no blockages.

Coverage

Coverage is dependent on the size of the de-laminated cavity and can differ widely from job to job. As a guide 1kg of Stickit Pro will treat approx 10m² of render, plaster or wall tile and 5m² of floor tile. Larger tiles or natural stone are typically laid with a larger notched trowel and voids can be significantly larger.

Drying Time

Stickit Pro has a pot life of up to 2 hours at ambient temp of 25 degrees c / 77 degrees f. Higher temperatures will decrease pot life and speed cure. Mixing larger quantities of adhesive (ie: more than one pouch) will decrease pot life.

Stickit Pro will form a flexible gel at end of pot life. This gel phase will continue for 48-72 hours after which Stickit Pro will harden and obtain full bonding strength. Avoid movement of the substrate during the gel phase to ensure optimal result.

Precautions: The injector needle is very sharp – keep protector cap on at all times when not in use and keep out of reach of children. Protect or mask all porous surfaces around injection holes as StickIt Pro will leave a tacky surface if left exposed.

Project Usage Instructions

Floor/Wall Tiles

To identify the drummy or de-laminated area tap gently on surface of tile with a large coin (e.g. 20 cent piece). De-laminated areas will sound hollow and give a different tone to solid/bonded sections. Clean affected area well with mild detergent and warm water. Dry the surface with a clean rag. Mark out affected area with masking tape, or chalk.

With vertical surfaces (e.g. walls) work from top to bottom, horizontal surfaces work from edges and corners back toward centre or exit points (e.g. doorways). Carefully drill holes around edges of tiles – retain mortar/grout dust after removing drill (you will use this to plug the hole afterwards to ensure the grout matches the original). Use a piece of paper or card to scrape up or catch falling grout dust.

Use a vacuum to remove excess dust from holes if available. Carefully push needle through hole in end of rubber grommet so needle tip is exposed. Insert the needle fully into drill hole and push rubber grommet against hole. Depress trigger and inject slowly. Release trigger and slowly release pressure on rubber grommet. It may be necessary to drill multiple holes around the perimeter before locating a void where Stickit Pro can flow freely under the tile. When Stickit Pro comes out of adjacent holes stop injecting. If adhesive leaks from wall tiles insert a round wooden splint to block hole. Inject more Stickit until it comes out of the hole then move to next tile or area. Injecting around edges will usually provide sufficient adhesive to re-bond tile if adhesive cannot flow freely underneath.

Best results are achieved by drilling and injecting smaller amounts of adhesive at approx. 100mm intervals around the perimeter of the tile.

Injecting larger amounts of Stickit Pro into floor tiles may raise level of the tile slightly. Where this occurs, a weight should be placed on the affected tile/s until dry to ensure the level is the same as surrounding tiles. Wipe any excess Stickit Pro that may be ejected from the drill holes when the weight is placed on the tile.

When treating floor tiles which have previously lifted due to expansion it may be necessary to remove a line of grout to allow the tile to sit flat again. Use a grout removal tool or take a grinding disk and break in half. Place a straight-edge (e.g. piece of timber) along the problem grout joint. Slide ½ grinding disk (flat side down) back and forth quickly until grout has been removed.

Concrete & Clay Pavers/Natural Stone/Porcelain/Travertine or Large Format Tiles

Same method as with floor tiles but it may be more effective to drill through the tile or paver to ensure sufficient Stickit reaches the problem area rather than working around the edges. Porcelain or tiles laid butted together may not have sufficient space to drill through grout. Do not attempt to drill along edge or in corners when grout width is less than 2mm as you may chip the tile edge. Your drill bit is designed to drill through tiles. When drilling through the tile do not drill closer than 5mm from the edge.

Cement Render / Plaster

Spot injecting along larger cracks is recommended as pre-treatment and to minimize the risk of dislodging sections of render/plaster. Carefully identify drummy area with a coin as for tiles. Take care when drilling not to disturb loose section of render. Drill holes along lowest edge of
de-laminated area and work upwards. If Stickit flows out of lower holes plug these with a round wooden splint and continue. For very loose sections of render/plaster inject a small area first and allow to dry before treating the next area. Take care not to inject too much Stickit to loose areas as this may force these sections off the wall.